East Islip Public Library
Project:
$980,000 Capital Improvements
$1.4 Million Capital Improvements
Completion Date:
2026
• Replacement of all HVAC Equipment servicing the Library
• New BMS System / Temperature Controls
• Commissioning of all new HVAC Equipment throughout the Library
• Replacement of the entire Roof on the Library
• Removal of non-functioning Solar Equipment
• Water-proofing Brick parapet walls
• Phased Construction so the Library can remain open the entire time